I looked at the process I am using to repair a section of floor and I want to make sure I am safe. Here is what I have at this point. Floor secured to the frame - check, C channel secured to the floor - check. I am now reading about securing the shell to the frame through the outriggers. Did I miss a step with securing the shell to the outriggers (I only have one outrigger on both sides)? What is that? Every part of the shell I accessed had a C channel attached to it and I attached it to the floor. If I did miss that what is the process for securing the shell to the outriggers and/or securing the shell to the frame?
Inscription à :
Publier les commentaires (Atom)
0 commentaires:
Enregistrer un commentaire