Streamline floor/shell construction

dimanche 26 avril 2015

I saw a past post with this same question, but can't find that post now. Either way, nobody responded to the post, so here it is again!

Does anyone know how the plywood floor interfaces with the shell on a 1969-1974 Streamline? Is it like an Airstream, where the plywood was laid on the frame and then the shell on top of the plywood? Or, I have heard Argosy/Avion's were constructed differently?

I'm acquiring a trailer of this vintage, and mentally prepping for what's to come.

Thanks!!


0 commentaires:

Enregistrer un commentaire

 

Lorem

Ipsum

Dolor