I am replacing a large section of plywood subflooring in my 93 25 ft Excella. Because the weather is getting cold, should I put the pieces tightly inside the c-channel or leave a 1/4 inch space for when summer humidity kicks in? The boards will be tightly screwed to the frame, so not sure what the correct procedure should be. Thanks in advance.
Inscription à :
Publier les commentaires (Atom)
0 commentaires:
Enregistrer un commentaire