Installed a PD 4655 converter upgrade and two new SRM24 Interstate batteries. I fully charged the batteries before I installed them.
When I energize the converter with shore power, I get the fast blinking light indicating they are at 90% or greater charge and are charging at 13.6 volts. I confirmed the voltage is in that range.
How long will it take the charging system to switch to float/maintenance voltage (13.2 volts)? It is a function of time? If so, does unplugging shore power reset the time/duration?
When I energize the converter with shore power, I get the fast blinking light indicating they are at 90% or greater charge and are charging at 13.6 volts. I confirmed the voltage is in that range.
How long will it take the charging system to switch to float/maintenance voltage (13.2 volts)? It is a function of time? If so, does unplugging shore power reset the time/duration?
0 commentaires:
Enregistrer un commentaire